Category : Industry


NTPC's UP Expansion: 14,000+ MW Capacity & Green Projects

NTPC is significantly expanding its energy infrastructure in Uttar Pradesh, with over 14,000 MW installed capacity and major upcoming projects including 1,600 MW at Singrauli Stage-III by 2028, alongside renewable energy and green hydrogen initiatives.

Solar Industry Urges RIICO to Shift Focus to Ajmer Road Zone

Industry leaders in Rajasthan are pushing RIICO to establish a dedicated industrial zone near Ajmer Road for solar panel manufacturing, citing its emergence as a major hub with over 13,000 MW capacity and potential for ecosystem growth.

Explosions at Maharashtra Cough Syrup Raw Material Factory

A series of explosions at a cough syrup raw material supply unit in Satara district's MIDC Tasawade destroyed chemicals and machinery. No workers were present, and fire tenders from sugar mills responded due to lack of local fire station.

MP Industries Hit by High VAT and Gas Supply Cuts

Industries in Madhya Pradesh are warning of production disruptions and potential shutdowns due to the country's highest VAT on natural gas and fresh supply cuts, seeking urgent intervention from regulators.

India Ties Electronics Subsidies to Local Design, Warns Firms

The Indian government has issued a stern warning to electronics manufacturers, stating that subsidies under the Electronics Components Manufacturing Scheme will only be granted to companies that embed design, quality, and engineering within India. This po

Gujarat Extends Solar Power Discount Hours for Industries

Industrial units in Gujarat will now receive electricity discounts for two additional daytime hours to promote solar power use and reduce reliance on costlier evening energy. The move is expected to save industries around Rs 128 crore annually.

Haryana Approves Rs 11,709 Crore Rail Projects

Haryana Rail Infrastructure Development Corporation approves revised project cost of Rs 11,709 crore and reviews major rail connectivity projects including Haryana Orbital Rail Corridor and Kurukshetra elevated track.

Bengaluru Business Corridor Phase-1 Tender Launched

The Bengaluru Business Corridor project has commenced with the release of its Phase-1 tender, adopting a design, build, operate, and transfer model. Construction is slated for 36 months, followed by 10 years of operation and maintenance.

Kanpur Incense Factory Fire: Workers Escape, No Casualties

A major fire broke out at an incense stick manufacturing unit in Kanpur's Tatyaganj area on Sunday night. Workers escaped safely, but the factory suffered substantial damage. Fire brigade teams controlled the blaze after deploying four units.

Surat Textile Units Adopt 12-Hour Single Shift System

Textile weaving units in Surat have unanimously decided to limit operations to 12 hours daily, moving to a single-shift system to reduce production. This strategic move aims to address rising input costs, weak global demand, and labor challenges in India'

Page 4 of 225
Pickt mobile sticky banner — logo, tagline and CTA button