Chandigarh Road Closure: Vikas Nagar Market Road Shut for Pipeline Work Dec 2-12
Chandigarh Road Cut at Mauli Jagran for Water Pipeline Work

The Municipal Corporation of Chandigarh has announced a significant infrastructure upgrade that will temporarily affect traffic in a part of the city. The civic body is progressing with its project to strengthen the tertiary treated (TT) water supply network and extend pipelines to areas currently lacking this service.

Road Closure Details for Pipeline Connection

To facilitate a crucial connection in this water supply system, the MC will need to cut the road at a specific location. The work will be carried out on Vikas Nagar Market Road in the Mauli Jagran area. This operation necessitates a full road closure to ensure public safety and allow for efficient completion of the task.

The closure is scheduled to be in effect for a period of ten days. The road will be closed from 10:00 AM on December 2 until 10:00 PM on December 12. Residents and commuters who regularly use this route are advised to plan their journeys accordingly and seek alternative paths during this period.

Scope of the Water Supply Enhancement Project

This road cutting activity is part of a larger, ongoing initiative by the Chandigarh Municipal Corporation. The primary objectives of this project are twofold:

  • Strengthening the existing tertiary treated water supply system. This involves upgrading the current infrastructure to ensure a more reliable and robust supply of TT water across the city.
  • Laying new pipelines in left-out areas. The MC is actively working to extend the reach of the treated water network to parts of the city that have not yet been connected, thereby improving water accessibility for more residents.

The use of tertiary treated water is a key component of sustainable urban water management, often utilized for non-potable purposes like irrigation, flushing, and industrial cooling, which helps conserve fresh drinking water.

Implications and Advice for the Public

While the road closure will cause temporary inconvenience, the MC emphasizes that the work is essential for long-term civic improvement. The enhanced water supply system will lead to better service delivery and resource management for Chandigarh.

Local authorities are expected to put up appropriate signage and may deploy traffic personnel to manage the flow of vehicles around the closed section. The public is urged to cooperate with these arrangements and follow the official diversion plans.

Residents of Mauli Jagran, Vikas Nagar, and surrounding localities can look forward to the benefits of an upgraded water infrastructure once the project is complete. The MC's notification serves as a proactive measure to keep citizens informed about developmental activities that shape their city's amenities.