Pune's ₹7,500-Crore Yerawada-Katraj Twin Tunnel Project Under Feasibility Scrutiny
Pune's ₹7,500cr Twin Tunnel Project Under Review

The fate of Pune's proposed mega-infrastructure project, the Yerawada–Katraj twin tunnels, now hinges on a critical feasibility study. The ambitious ₹7,500-crore plan, designed to create a major north–south connectivity corridor, was a key topic at a recent Pune Metropolitan Region Development Authority (PMRDA) meeting chaired by Chief Minister Devendra Fadnavis.

Project Status and Official Statements

Deepak Singla, the Additional Commissioner of PMRDA, confirmed on Tuesday that the crucial feasibility assessment for the twin tunnel project is currently in progress. He stated that once this study is complete, its findings will be presented before the Pune Unified Metropolitan Transport Authority (PUMTA) to seek final clearance. The tunnel proposal was among roughly 220 infrastructure projects reviewed during the PMRDA meeting held last week in Nagpur.

Singla emphasized that the project's primary goal is to enhance connectivity between the northern (Yerwada) and southern (Katraj) parts of the city. However, he made it clear that no final decision has been made, and the project's future depends entirely on the outcomes of the ongoing study and subsequent approvals.

Addressing Past Concerns and Challenges

This high-profile proposal has not been without controversy. In earlier discussions, PUMTA members voiced significant reservations, focusing on several critical areas:

  • Technical and financial feasibility of the massive undertaking.
  • Potential environmental impact of tunneling through sensitive hill terrain.
  • Justification of the enormous cost versus the projected benefits and traffic volumes.

Officials have indicated that the current feasibility study is specifically designed to tackle these pointed questions. It will meticulously examine alignment options, potential construction challenges, realistic traffic projections, and viable funding models. "The idea is to place all data on the table so that an informed decision can be taken," Singla added, underscoring the transparent intent behind the review.

Potential Impact and Cautious Optimism

If the project eventually receives the green light, the twin tunnels would offer a direct underground link, bypassing some of Pune's most congested surface arteries. This could significantly ease traffic pressure on key roads like Shankar Sheth Road, Satara Road, and Nagar Road.

Despite the potential benefits, urban planners and authorities remain cautious. A PUMTA member highlighted that feasibility studies must provide a balanced view, realistically assessing risks and geological challenges alongside the projected benefits, to avoid unforeseen cost escalations and technical hurdles.

The upcoming PUMTA meeting is poised to be a decisive moment. Officials have stressed that the project will only advance to the next stage after the feasibility report undergoes rigorous scrutiny by the unified transport authority. The future of Pune's north-south corridor now rests on this detailed evaluation.