Category : Search result: elevated corridor delay


Delhi-Patna trains delayed up to 12 hours due to dense fog

Dense fog and poor visibility severely disrupted train operations on the Delhi-Patna route, causing massive delays and passenger hardship. Key trains like Rajdhani and Sampoorna Kranti were delayed by over 10 hours. Read more for details.

Kochi's 5-km Elevated Highway to Open by March

NHAI plans to open a 5-km elevated highway segment on the Kochi-Alappuzha corridor by March, featuring Kerala's first dedicated highway cycle track. Read about this major infrastructure boost.

Dense Fog Disrupts Rail Ops in Chandigarh for 8th Day

Dense fog continues to cripple rail services in Chandigarh for the 8th consecutive day, causing major delays to Shatabdi, Vande Bharat & long-distance trains. Check latest updates before you travel.

MP Premachandran Seeks Safe Elevated Roads on NH 66

Kollam MP N K Premachandran urges Nitin Gadkari to replace earthen elevated roads on NH 66 with pillar-based structures after scientific study. Read about the safety concerns raised in Lok Sabha.

Belagavi's First Flyover Approved at Rs 275.5 Crore

Belagavi's long-awaited first flyover, a 2 km Elevated Corridor from Hotel Sankam to Dharmaveer Sambhaji Maharaj Chowk, gets administrative approval. Read about the project's details and impact.

NHAI Moves to Fast-Track Kochi's Elevated Highway Project

NHAI appoints HEC to prepare a revised DPR for the long-delayed Edappally-Aroor elevated highway. Design complexities, including the Kochi Metro alignment, have caused delays. The crucial stretch is key to managing NH 66 traffic. Read more.

Patna-Ara Road Closure for 7 Months from Dec 18

Major traffic disruption between Patna and Ara as Shivala-Kanhauli road closes for over 7 months for NHAI's elevated road project. Check diversion routes and school vehicle timings.

Page 1 of 4