Delhi Metro Phase 4: DMRC Erects 20 km Barricades for Winter Safety
Delhi Metro Phase 4: 20 km Barricades for Safety

Delhi Metro Phase 4: DMRC Implements Extensive Safety Measures with 20 km Barricades

The Delhi Metro Rail Corporation (DMRC) has taken a significant step to enhance safety around its ongoing Phase 4 construction sites. In a proactive move, the corporation has barricaded nearly 20 kilometers of metro construction areas along the Phase 4 corridors. This initiative is specifically designed to safeguard both vehicles and pedestrians in the vicinity of these under-construction sites across the national capital.

Addressing Winter Visibility Challenges

The decision to install these extensive barricades comes in response to the severe visibility issues that arise during the winter months. Heavy fog, which can occur both during the day and at night, drastically reduces visibility, posing a heightened risk to traffic and foot movement near construction zones. By erecting these barriers, DMRC aims to mitigate potential accidents and ensure a safer environment for all commuters and residents.

Key Details of the Safety Initiative

The barricading effort covers multiple corridors under the Delhi Metro Phase 4 expansion, which is a crucial infrastructure project aimed at improving urban connectivity. The measures include:

  • Strategic placement of barricades along high-traffic areas to prevent unauthorized entry and reduce collision risks.
  • Enhanced signage to alert drivers and pedestrians about construction activities and potential hazards.
  • Regular monitoring by DMRC officials to ensure the barricades remain effective throughout the fog-prone season.

This safety drive underscores DMRC's commitment to prioritizing public welfare while advancing metro infrastructure. As winter sets in, such precautions are essential to maintain smooth operations and protect the community from the adverse effects of seasonal weather conditions.