Category : Search result: NTPC cooling tower fire


NTPC adds 359.585 MW solar capacity, reaches 85.5 GW

State-owned power giant NTPC expands its renewable energy footprint, adding 359.585 MW of solar capacity. Its total commercial capacity now stands at 85.5 GW. Read more about India's green energy push.

Gurgaon: Twin Fires at Industrial Sites, No Injuries

Two separate fires broke out in Gurgaon on Tuesday morning—one at a plastic waste processing site and another at a tyre warehouse. Thick toxic smoke hampered operations, but no casualties were reported. Read the full details.

Massive Fire Engulfs Ludhiana Cattle Feed Factory

A massive fire broke out at a cattle feed plant in Ludhiana's Dhandari Kalan area, requiring 20 fire tenders. No casualties reported, but the factory is severely damaged. Read the full report.

Fire at Lower Parel Industrial Unit, One Worker Rescued

A fire caused by a short circuit engulfed an embroidery unit in Mumbai's Lower Parel. While most employees escaped, one was rescued from a bathroom by the fire brigade. Read the full details of the incident and response.

Delhi Fire in Sangam Vihar Claims 4 Lives

A devastating fire in Sangam Vihar's Tigri Extension-1 gutted a four-storey building, claiming four lives including owner Satender Gupta. Read the full story of the tragedy and the rescue efforts.

Hong Kong Fire: 83 Dead, Survivor Found in Stairs

A man was miraculously rescued from a stairwell 24 hours after a massive fire engulfed a Hong Kong high-rise. The death toll has risen to 83, with over 280 missing. Read the latest updates.

RRB NTPC 2025 Registration Closes November 27

RRB NTPC 2025 registration for 3,058 UG posts ends November 27. Apply now for Clerk, Typist positions. Application fee deadline: November 29. Correction window opens November 30.

Page 2 of 4