Temperatures Drop Below Freezing Point in Kashmir Again
After a short-lived respite, severe cold returns to Kashmir as temperatures plummet below freezing. Srinagar records -0.5°C, with Pahalgam at a chilling -4.2°C. Read the full weather forecast.
After a short-lived respite, severe cold returns to Kashmir as temperatures plummet below freezing. Srinagar records -0.5°C, with Pahalgam at a chilling -4.2°C. Read the full weather forecast.
A CRPF head constable was attacked by a leopard inside a paramilitary camp in Anantnag, south Kashmir. The incident highlights a worrying rise in wild animal encounters in the region. Read the full report.
Bengaluru's Yelahanka to get India's first fully elevated railway terminal at a cost of Rs 6,000 crore. The project aims to decongest the city and boost connectivity. Read for details.
Kolkata Metro Railway will run special services on Christmas Day, December 25th, for Blue and Green lines with extended hours and frequent intervals. Plan your festive travel now!
Kolkata Metro will run extra late-night services on Blue and Green Lines on December 25 for Christmas crowds heading to Park Street. Check the special schedule here.
Parts of Kashmir receive fresh snowfall and rain, leading to road closures and a drop in temperatures. Get the latest weather updates and travel advisories here.
Railway Board EDCC Shailendra Singh inspected Banaras Railway Station, directing staff on maintenance, future development, and commercial management. Read the full report.
Industry leaders and activists demand progress on the 240km Sambhajinagar-Dharashiv rail line. The project promises to boost industry, tourism, and regional development in Marathwada.
BMRCL announces a major push to operationalise 79km of new Metro corridors in Bengaluru by 2027, including the airport line. Details on timelines, new trains, and the Orange Line tender.
Bengaluru's Namma Metro enhances Yellow Line service, reducing train intervals to 13 minutes from Tuesday. Commuters on the RV Road-Bommasandra route can expect less waiting time and smoother travel.
Planning a Kashmir trip? Know the best time for snowfall during Chillai Kalan 2025. Get details on dates, places to visit, and travel tips for a magical winter holiday.
North Eastern Railway's Varanasi DRM Ashish Jain inspected safety & passenger amenities at Sadat and Jakhaniyan stations. Read about the key findings and instructions issued.
A 17-year-old pharmacy student and an unidentified man died after being hit by trains near Kadambathur station. Locals blame lack of safe crossing despite decade-long demands.
Heavy snowfall has blocked the Mughal Road and Sinthan Pass, crucial alternative routes to Kashmir Valley. Authorities are working to restore connectivity. Read the latest updates.
The first dedicated foodgrain freight train has reached Anantnag, Kashmir, marking a new era for supply chains following the PM Modi-inaugurated rail link. Read how this transforms the region's logistics.
The Centre has sanctioned 38 crucial railway projects worth Rs 89,780 crore for Maharashtra, boosting connectivity and infrastructure. Read about the key routes and economic impact.
The crucial field survey for the Almatti-Kushtagi railway line is finished. The DPR is due by May 2026, promising better connectivity for central & north Karnataka. Read more.
The crucial survey to convert the Pathankot-Jogindernagar narrow gauge railway line to broad gauge is complete, paving the way for enhanced connectivity in Himachal Pradesh's Kangra district. Read more about this transformative project.
A new 237-km fourth railway line between Itarsi, Bhopal, and Bina, built at Rs 4,329 crore, promises to end delays, boost freight, and spur economic growth in central MP. Discover the impact.
South Western Railway detects over 7.7 lakh ticketless travel cases Jan-Nov 2025, a 10% jump. Bengaluru division sees highest violations. Officials cite increased checks and passenger volume.
Railway Minister Ashwini Vaishnaw informed Lok Sabha that survey for Pathankot-Jogindernagar gauge conversion is done. DPR is being prepared. He also detailed the massive strategic Bilaspur-Manali-Leh rail project. Read for full details.
The detailed project report for the new Almatti-Kushtagi railway line will be completed in the next five months, Union Minister Pralhad Joshi announced. The survey work is already finished.
Central Railway converts retired coaches into 24x7 multi-cuisine restaurants at four new stations. 10-year contracts offered to attract major food brands. E-auction on Dec 22.
South Western Railway's Mysuru division reports a major surge in revenue from ticket checking, with Rs 89.4 lakh collected in Nov 2025 alone. Read how intensified enforcement is curbing unauthorized travel.
Counter-Intelligence Kashmir conducts valley-wide raids in a case from 2 years ago involving social media posts accused of radicalising youth. Details on districts, charges.
MP Praveen Patel leads high-level meeting with Railway Board officials to preserve Prayagraj's 165-year-old railway heritage. Key proposals include adaptive reuse and accurate documentation.
Himachal Pradesh's failure to transfer land and pay its share is delaying the Rs 6,753 crore Bhanupalli-Bilaspur-Beri railway line. Get the full details on the project's status and strategic implications.
Sairang Railway Station in Mizoram receives its first direct automobile train, carrying 119 cars. This historic move enhances vehicle availability, cuts road transport reliance, and boosts the state's economy. Discover the impact.
Southern Railway completes phase of Kochu Veli station redevelopment with lifts & pit lines. Passengers demand ticket counters, shelters, more train stops to decongest Central. Read more.
Technical issues disrupted Mumbai Metro Lines 2A and 7 for two hours on Sunday night, causing major delays and passenger inconvenience. Services resumed after 9 pm. Read for details.