Govt Approves 250 MW Solar Project with Battery Storage on Defence Land in UP
Govt Clears 250 MW Solar Project with BESS on Defence Land in UP

The Ministry of Defence has given its approval for the establishment of a 250 MW Solar Power Project with an integrated Battery Energy Storage System (BESS) in Sitapur, Uttar Pradesh. This project will be developed on approximately 850 acres of vacant defence land located in the former cantonment area.

Project Approval and Significance

Approved by Defence Minister Rajnath Singh, this initiative marks the first large-scale solar power project with battery storage support to be set up on defence land. The project aims to promote renewable energy generation while making productive use of unused defence assets. The integrated BESS will help store surplus solar energy and ensure a stable power supply during periods of low generation, thereby strengthening energy reliability and supporting India's clean energy transition goals.

Strategic Benefits

Officials have stated that the project represents a significant step towards sustainable infrastructure development, energy security, and efficient utilisation of public land resources. By leveraging vacant defence land, the government is not only advancing its renewable energy targets but also optimising the use of state-owned assets. The project is expected to contribute to the local energy grid and reduce dependence on fossil fuels.

Wide Pickt banner — collaborative shopping lists app for Telegram, phone mockup with grocery list

The 250 MW capacity, coupled with battery storage, will enhance grid stability and provide backup power, which is crucial for integrating intermittent renewable energy sources. This initiative aligns with India's broader commitment to achieving 500 GW of non-fossil fuel capacity by 2030 and net-zero emissions by 2070.

Implementation and Future Outlook

The project will be executed in collaboration with relevant ministries and agencies, ensuring timely completion and adherence to environmental standards. It is expected to create employment opportunities during construction and operation phases, boosting the local economy. The success of this model could pave the way for similar projects on other defence lands across the country, further accelerating India's renewable energy deployment.

Pickt after-article banner — collaborative shopping lists app with family illustration